Tremonton City is soliciting competitive sealed proposals from qualified Engineers and Engineering firms to provide engineering services to have designed and constructed an Aquifer Storage and Recovery (ASR) project.  An ASR project injects an aquifer with culinary water during low-demand times (October to April) to extract water during higher demands months of June through September.  The ASR process replenishes the aquifer and builds up a recharge mound by utilizing the confining geologic layers within the well zone to contain the injected water.

The City has submitted a Community Development Block Grant (CDBG) application for an ASR project.  As a part of submitting a final CDBG application, the City must submit a cost estimate for this ASR project.  This cost estimate must be completed before the final CDBG application deadline, May 31, 2023.  The City is seeking an Engineer/firm to prepare a cost estimate for the City’s ASR project before the stated deadline.

If the City is awarded a Community Development Block Grant, the City will use the selected Engineer/firm that prepared the cost estimate to provide full engineering services for the ASR project, which includes: programming, design, preparation of construction documents, reproduction costs, permitting, bidding, bid evaluation, construction administration, final inspection, and project acceptance (hereafter referred to as “Full Engineering Services”).  Full Engineering Services are exclusive of soils test and special inspections.

The selected Engineer/firm must comply with all applicable Community Development Block Grant (CDBG) and regulatory requirements in performing services outlined herein.

Request for Proposal – Information Packet